Dawn DeWitt-Viele 

Last updated:  09/23/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


High Point, NC  27261
US

Mobile: 9199859405   
Home:
9199859405
dviele063@gmail.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: DeWittResume

Resume Value: hd5z2zchku9vk6qt   

  

 


 

 

 

PROFESSIONAL SUMMARY

Hands-on experience as a Primavera Master Scheduler, tracking, reporting, budgeting and scheduling.  Extensive project management, planning, and developments and change control and project supervisory experience. 13 years of HR for Residential Construction Company.  W2’s, 940, 941, and recruiting of employees in all aspects of the construction industry. Production planning in a high volume Manufacturing and Automobile Setting

 

TECHNICAL SUMMARY

Primavera P3 (10 years) Proficient on P5.0 and P6.0 and P7.0, ISO Procedures, Word, PowerPoint, Access, Excel, Oracle, sharepoint,Visio, Project Net, Suretrak, and Webster, Great Plains Purchasing System, AS400 Purchasing Program, Synergen, and SAP. Super User for P6 and P7 training of others.

Working with Engineering and Drafting pulling drawings for the Project Managers both with Sevenson engineering on a dredging project and with General Electric.

 

 

PROFESSIONAL CONTRACT EXPERIENCE

 

Matthews Group Inc /High Point, NC

February 2014-May 2014

Production Planner/Production Supervisor

·   Planning and scheduling of all various types of school busses all over the United States

·   Overseeing production of materials and planning of work being done in and out of school busses

·   Installation of air conditioners, hand rails, modesty panels, compressors, mounts, handicap panels,etc

·   Running work orders, percentages of completes, cost, inventory, and assembly

·   Supervising and directing 10 production employees

·   Using excel spread sheets, Microsoft software

·   Purchasing in Great Plains

·   Logistics of Thomas Buses

 

 

Seminole Electric/Randstad Engineering Bowling Green, Florida

November 2012-April 2013 (consultant

Planner-Procurement-Inventory-Receiving-Logistics

·   Responsible for inventory, receiving, stock code changes, catalog additions, and quantity changes.

·   Oversaw purchasing, requisitions.

·   Reviewed, analyzed, planned and scheduled work orders to be performed by maintenance, operations, and contractors, including availability of spare parts. Developed routine preventive maintenance job plans.  Developed, planned, scheduled, and monitored annual outage maintenance tasks.  Maintained records for issuing, tracking and history of preventive maintenance. Ensured periodic maintenance intervals are correct and accurate test dates are entered within the Synergy maintenance program.

·   Worked with Fed-EX, UPS and major trucking firms to ship and receive.

 

White Construction Brookesville, Florida

August 2012-October 2012 (Consultant)

Lead Master Scheduler

·   Worked on a complete reconstruction of an old Biomass Cycle Plant in Tampa, Florida that was once running and reconstructed.

·   Maintained and updated 10,000 activities for the civil, mechanical, construction and supervision of this large Biomass Cycle Plant. 

·   Conducted weekly and monthly meetings and updates to keep everyone current on the progress and work that was being performed on time, and the activities that were waiting on materials or inspections. 

·   Performed walk downs of this large cycle plant and keeping in touch with supervisors and manager.

·   Responsible for accounting, cost coding and resource loading.

·   Supervised and Led 6 schedulers.

 

 

 

 

TIC Construction

February 2012 - March 2012 (Consultant)

Field Engineer II/Primavera Scheduler                                                        

·   Worked on a combined cycle plant in Goldsboro, North Carolina.  This was a new built cycle plant for Progress Energy. 

·   Maintained and updated 10,000 activities for the civil, mechanical, construction and supervision of this large      Combined Cycle Plant. 

·   Conducted weekly and monthly meetings and updates to keep all parties involved current on the progress and work that was being completed on time, and the activities that were waiting on materials or inspections.

·   Walk downs of this large cycle plant and keeping in touch with the supervisors and the manager.

 

BHI Energy/Progress Energy Raleigh, North Carolina

September 2011 – February 2012 (Consultant)

Ace Long Term Planner/Master Scheduler Primavera                                                                                                                                                                                                                                                                  

·   Long Term Planner/Scheduler Manager for the Nuclear Division and Outage Management.

·   Performed modifications, in-processing, and outage scheduling.

·   Maintained job cost, resource loading, and schedule in a timely manner.

·   Used P7 for two different job locations primavera software issues, updates, EVM, baselines, WBS, resource loading, cost accounting, and critical paths.

·   In charge of planning and scheduling for the in-processing for the PEM group and the Fleet Division.

.

 

Babcock & Wilcox Charlotte, North Carolina                                                                                    
March 2011 - September 2011 (Consultant)

Project Control Engineer

·   Master Scheduler for the Nuclear Division and Outage Management.

·   Managed job cost, resource loading, and schedule in a timely manner.

·   Used P7 for two different job locations primavera software issues, updates, EVM, baselines, WBS, resource loading.   

·   Security clearances and work pertained to Sharon-Harris.

·   Responsible for accounting cost coding and resource loading.

·   DOE experience

 

MNES, Fort Mill, South Carolina

Dominion Power                                                           

August 2010 - March 2011 (Consultant)

Project Control Engineer                                                      

·   Master Scheduler working for MNES in collaboration with URS, AEA and Dominion Power on the construction of a new Power Plant.

·   Nuclear modifications and outages.

·   Worked in P6 Project Management.

·   Responsible for accounting, cost coding and resource loading.

·   DOE Experience

 

Duke Energy, Charlotte, North Carolina                                      

August 2009 – Feb 2010 (Consultant)

Master Scheduler/Primavera Scheduler                                                       

·      Master Scheduler for the Nuclear Division and Outage Management.

·      Nuclear modifications and outages

·      Maintained job cost, resource loading, and schedule in a timely manner.

·      Used P6 for two different job locations.

·      Super user for all of Duke in primavera software issues, updates, EVM, baselines, WBS, resource loading, cost accounting, and critical paths.

·      Worked on all the Duke Sites.

·      Responsible for accounting, cost coding and resource loading.

·      IT Implementation, conforming, building and supervised others.

·      DOE Experience

 

 

 

 

 

 

 

Trans-Nuclear, Columbia, Maryland                                      

August 2008 – Feb 2009 (Consultant)
Master Scheduler/Project Management    

·   Master Scheduler in P6 and P3 keeping track of all deliveries and builds for sites.

·   Nuclear modifications and outages

·   Implementation of schedule for 6 project managers.

·   Deliveries of fabrication and assembly of units for spent waste on all projects.

·   Working with 6 project managers on civil and commercial construction for all projects.

·   Primavera software issues, updates, EVM, baselines, WBA, resource loading, cost accounting, and critical paths.

·   Responsible for accounting, cost coding and resource loading.

 

Florida Power and Light, Juno Beach, Florida                                              

2006 – 2008 (Consultant)
Master Scheduler

·   Master Scheduler in P3, P5 and P6 keeping track of all outages for Saint Lucie, Turkey Point, and Seabrook.

·   Worked on multimillion dollar power outages on nuclear.

·   Resource loading, level of effort, and implementation.

·   Lead for 6 project managers, civil, mechanical, and electrical.

·   Nuclear Modifications and Outages

·   A badge employee for Absolute Consulting.

·   Primavera software issues, updates, EVM, baselines, WBA, resource loading, cost accounting, and critical paths.

·   Responsible for accounting, cost coding and resource loading.

·   In charge of 7 schedulers on 7 different sites, Master Scheduler.

·    

Sevenson Environmental Services, Niagara Falls, NY                            

2005 – 2006 (consultant)
Master Scheduler/Project Control     

·   Responsible for procurement and materials management, change orders and submittals.

·   Developed, changed and responded to RFQ's and RFI's.

·   Worked with Insurance and Bonds for Insurance Liabilities.

·   Master Scheduler in P3 and P5.

·   Worked on a $500M dollar project in Fort Edward, New York.

·   Management of Civil Construction with DA Collins.

·   Responsible for Primavera software issues, updates, EVM, baselines, WBA, resource loading, cost accounting, and critical paths.

 

General Electric, Schenectady, NY                                                            

2002 - 2005 (Consultant)                   
Planner/Scheduler P3                                                      

·   Purchased all outage materials, payroll, time sheets, contracts, percentages complete, and schedule in both Suretrak and baseline.

·   Informed management of the percentage completed, all purchasing and contracts.

·   Master Scheduler in Primavera 3.

·   Responsible for Baseline Software.

·   Reported to the site manager and project manager all aspects of schedule vs. goal, both financially and accomplishment issues.

·   Worked with commercial companies, documenting man hours, and transmittals of bid packages, and invoices for the commercial builders.

·   Managed all accounts, and responsible for the daily performance of scheduled meetings. 

·   Maintained and coordinated all Material Management Reports Tracking and Material Reporting Forms Tracking. 

·   Primavera software issues, updates, EVM, baselines, WBA, resource loading, cost accounting, and critical paths regarding nuclear modifications and outages.

·   Managed relationships with Fed-EX, UPS and major trucking firms to ship and receive

                                      

 

 

 

 

 

 

 

 

 

 

 

Dawn DeWitt -Viele                                

 

Greensboro, North Carolina

dviele063@gmail.com

919-841-8658

 

 

 

 

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Project Control/Master Scheduler

Transnuclear

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Active Confidential

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Project Control/Master Scheduler

Desired Status:

Full-Time

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-NC-Greensboro

Relocate:

No

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

English

Fluent